01Getting started
What types of projects can AESI support?
AESI supports hydrographic, geospatial, infrastructure, environmental, construction, industrial, and resource-sector projects across a wide range of site conditions.
Who can benefit from AESI’s services?
Our services can support a wide range of clients including federal, provincial, and municipal governments, First Nations and Indigenous organizations, engineering and environmental consultants, contractors, utilities, resource and industrial operators, and other private-sector organizations.
Do we need to know which equipment to request?
You can start with the question your project needs to answer. Tell us what you need to understand, where the work is located and how you intend to use the results. That gives the discussion a practical starting point, even if the survey method has not been selected.
When should we involve a survey team in project planning?
Early discussions can help identify gaps in existing information before fieldwork or design decisions are committed. Bring the project area, available records and any access or scheduling constraints so the survey scope can be discussed alongside the wider project.
02Bathymetric surveying
What does a bathymetric survey show?
Water depths and submerged terrain in rivers, lakes, reservoirs and channels.
What is the difference between single-beam and multibeam sonar?
Single-beam sonar measures depth directly beneath the survey vessel along individual survey lines. Multibeam sonar captures a much wider area of the bottom, providing greater coverage and detail. The appropriate method depends on the project scope, site conditions, and required level of detail.
What affects survey coverage and the level of detail?
Water depth, bottom conditions, vessel access, positioning and the selected sonar system all influence what can be measured. Define the features you need to resolve at the outset: a general view of the bottom and a detailed investigation of a small structure may call for different approaches.
When should a previous bathymetric survey be updated?
Consider what may have changed since the survey was collected, including dredging, sediment movement, construction or a significant flow event. Its age is only part of the picture. The original coverage, reference system and level of detail also need to suit the decision being made today.
03Dredge surveys & monitoring
When can AESI survey a dredging project?
Before, during and after dredging to document conditions, track progress and verify completed depths.
How can surveys support dredging volume calculations?
A pre-dredge surface provides a measured starting point. Comparing it with a design surface can support an estimate of material to remove; comparison with a post-dredge surface can help quantify measured change. The survey limits, reference levels and calculation method should be agreed for the project.
Why might pre-dredge and post-dredge results differ?
The surveys describe conditions at different times. Dredging, subsequent sediment movement and differences in coverage or processing can affect the comparison. A consistent reference system and clearly documented survey methods help the project team interpret what the measured change represents.
04Integrated 3D mapping
Do you provide both above-water and underwater surveying?
YES — Our capabilities span both environments and include hydrographic surveying, LiDAR, UAV photogrammetry, laser scanning, mobile mapping, ROV inspection, and other geospatial technologies.
Can multiple survey technologies be used on the same project?
Yes. Combining technologies can provide a more complete understanding of a site. Sonar, LiDAR, UAV imagery, laser scanning, and other survey methods can be integrated to capture both submerged and above-water features within a coordinated dataset.
Why capture the shoreline and underwater area together?
A project does not always stop at the waterline. Coordinated above-water and underwater information can help teams understand how banks, structures and submerged terrain relate to one another, rather than working from separate views of the same site.
What makes separate datasets fit together?
The datasets need compatible horizontal and vertical references, with sufficient control and overlap to check their relationship. Existing files should be reviewed for coordinate systems, units and collection dates before assuming that they can be combined directly.
05Infrastructure & underwater inspection
Can AESI survey submerged structures?
Yes, including bridge pilings, dam components, intakes and foundations.
What if underwater visibility is limited?
ROVs, side scan sonar and imaging sonar support underwater inspection and documentation.
Can surveys help document scour around bridge piers?
Mapping the bed around piers can document depressions, exposed features and changes in surrounding terrain. Repeat surveys can support comparison over time. The survey information should be interpreted within the broader engineering assessment of the structure and its site conditions.
How do sonar imaging and ROV inspection complement each other?
Sonar can provide information where murky water limits camera visibility. ROV imagery can add visual context where lighting, visibility and access allow it. The methods answer different questions; small defects or material condition may need closer inspection beyond what an acoustic image can show.
06Sediment & subsurface investigation
Can AESI investigate beneath the bed?
Sub-bottom profiling investigates underlying layers; core sampling recovers physical sediment.
What is the difference between sub-bottom profiling and sediment sampling?
Sub-bottom profiling uses acoustic reflections to investigate layering below the bed. Sampling recovers physical material for examination or testing. One provides an interpreted view along survey lines; the other provides material from specific locations. Together, they can help connect observed layers with actual sediment.
Can sub-bottom profiling identify everything beneath the bed?
The result depends on the sediment, acoustic conditions and equipment used. Some layers may be clearer than others, and penetration varies. Treat the profiles as interpreted evidence; targeted sampling or other investigation may be needed to answer questions that the acoustic data cannot resolve.
07Survey planning & existing data
How do you determine which survey method is right for a project?
We consider project objectives, site conditions, water depth, accessibility, required accuracy, coverage, and final deliverables to determine the most appropriate technology or combination of technologies.
Can you work with existing project data or previous surveys?
Yes, where suitable. Existing survey data, CAD files, GIS information, imagery, previous surfaces, and other project records can often be incorporated to support comparison, planning, monitoring, or continued project development.
What should I include when contacting AESI?
To start the conversation, share your project location, the question you need answered and any available drawings or previous survey information. Outline your intended use of the results so the discussion can focus on what your team needs.
What site information is useful before mobilization?
Share the survey boundary, launch or access points, known obstructions and available site drawings. Include site contacts, operating hours and any coordination requirements. If parts of the site are difficult to reach, flag them early so access can be considered when defining the fieldwork.
How do water levels, currents and weather affect planning?
These conditions can affect access, vessel operation and the ability to collect useful data. Water-level information also matters when relating measured depths to a project reference. Discuss seasonal conditions and operational constraints early so the field plan reflects the site.
What deliverables should we request?
Start with how your team will use the information: design, comparison, inspection, quantities or a site record. Then discuss the appropriate drawings, surfaces, point clouds, imagery or reporting, together with file formats and coordinate references. Agreeing those requirements early helps avoid receiving data that your workflow cannot readily use.
Ready to talk specifics?